Home / Solutions / Data migration

Migration that reconciles before go-live, not after.

Moving from Sage, Xero, QuickBooks, Excel or a legacy project system into NetSuite is where implementations quietly go wrong. We treat it as an accounting exercise, not a file transfer. Every load is staged in a sandbox, reconciled against the source, and recorded in a verification report that your finance team signs.

SourceClient extract or legacy export, normalised into a mapping workbook.
SandboxSample load, then full load. Totals reconciled to the source.
ProductionLoaded only after the verification report is signed.
Mapping workbookImport templatesExceptions logVerification report

What we migrate

Most projects need some of each. We scope by data set, agree the cut-off and history rules with finance, and load in dependency order so nothing refers to a record that does not exist yet.

Data setTypical sourceWhat we load into NetSuiteHow it is proven
Chart of accounts and segmentsSage 50, Sage 200, Xero, QuickBooksAccounts, subsidiaries, departments, classes and locations, with the legacy code kept as an external IDAccount count and type check, mapping signed by the finance lead
Customers, suppliers and itemsAny ledger, Excel price lists, product mastersEntities with addresses, terms, VAT and bank details; service, non-inventory and inventory itemsRecord counts, duplicate check, sample records inspected on screen
Opening balancesTrial balance at cut-offOpening journal by subsidiary, with the control accounts reserved for the sub-ledgersTrial balance ties to the source to the penny
Open debtors and creditorsAged debtor and creditor reportsOpen invoices, bills and credits as real documents, so ageing, statements and payment runs work from day oneSub-ledger total equals the control account; ageing buckets match
Projects, tasks and requisitionsExcel trackers, legacy PSA, bespoke databasesProScope project headers, project tasks, activity tasks and requisitions, with legacy project numbers preservedPlanned cost and revenue reconciled by project and by activity
Cost to date on live projectsLegacy ledger or job costingCost journals tagged to project and activity task, using the approach that matches how the trial balance was builtMargin to date in ProScope equals the legacy job report
HistoryPrior-year ledgersUsually monthly summary journals for two years; full detail only where there is a reporting or audit needComparative profit and loss agrees month by month

How a migration runs

The same sequence on every project, whether it is a few hundred project headers or a full ledger. The order matters, because each stage produces the control totals the next one is checked against.

01

Scope and cut-off

Agree which data sets move, the cut-off date, how much history, and who signs each reconciliation. Written down before any extract is taken.

02

Mapping workbook

One workbook per data set: source column, NetSuite field, transformation rule, and the control subtotal. Finance reviews the mapping, not a CSV.

03

Sample load, first sandbox

A representative slice of each data set, loaded and walked through on screen with the people who will use it. Messy data shows up here, when it is cheap to fix.

04

Full load, second sandbox

The complete data set in dependency order: headers, then tasks, then activity tasks, then requisitions, then cost journals. Timed, so the production window is known.

05

Reconcile and report

System totals against source totals at every level. Variances explained or fixed. The verification report records both and is signed by the client.

06

Production load

Repeated from the same files with the same scripts. The exceptions log is handed over with every record that needs a human decision.

How it works in practice

Four situations we meet repeatedly, and how each one is handled. Named case studies with figures are available on request.

ProScope, from Excel

Years of quote lines in one workbook

A contractor's planned cost and revenue lived in a single spreadsheet, grouped by activity. We normalise the lines into the ProScope template, load them as activity tasks against the live project, and reconcile at both project and activity level against the workbook footer.

  • Cost is expected to tie exactly. Revenue often differs by pennies because per-line margin rounding aggregates differently in ProScope.
  • A rounding variance is documented in the report, not forced out with a plug.
  • The client signs the report before the same load runs in production.
ProScope, group operating company

A full project book in five dependent loads

An operating company within a group moves thousands of project records ahead of go-live. The files are sequenced so each one supplies the external IDs the next depends on: project headers, project tasks, activity tasks, requisitions, then cost journals.

  • Legacy project numbers kept as external IDs, so old references still resolve.
  • Sample pass in the first sandbox, full timed pass in the second.
  • Supplier invoices that reference a project not in the load go on the exceptions log for finance, not into NetSuite.
Cost to date

Two ways to load project cost, and how we choose

Cost to date on live projects is where migrations double-count. The right journal depends on whether project costs are already inside the opening trial balance.

  • Already in the trial balance: a reclassification journal, debit and credit to the same cost of sales account. Nil ledger impact, and ProScope sees the cost against the activity task.
  • Excluded from the trial balance: a new posting, with the credit held in a migration clearing account that is swept at close-off.
  • Which one applies is confirmed in writing with finance before a single journal is loaded.
Ledger, from Xero or Sage

Open items that behave like open items

The trial balance is only half the job. Trade creditors and debtors must arrive as individual open bills, invoices and credits rather than one journal, otherwise ageing, statements and payment runs are wrong on the first morning.

  • Control account balance equals the sub-ledger list, checked before and after cut-over.
  • Construction Industry Scheme deductions carried across where they apply, so the first monthly return is right.
  • Item master rebuilt from the legacy export with VAT codes and income accounts mapped.

What you receive

Every migration hands over four documents, so the work can be audited and repeated without us.

  • Mapping workbook per data set, with transformation rules and control totals
  • Import templates and the scripts used to produce them
  • Exceptions log: every record that needed a decision, and who made it
  • Verification report: source against system at each level, variances explained, signed
Do we have to bring across all our history?

Rarely. Two years of monthly summary journals cover most reporting needs. Full transaction history is loaded only where there is a specific audit, warranty or reporting reason, and it is costed separately.

Can finance keep working during the migration?

Yes. The sandbox loads happen alongside normal operation. Production cut-over is usually a weekend, with opening balances taken at the agreed month-end.

What if our legacy data is messy?

It usually is. Cleansing decisions are logged and made by your team, not silently by us. Duplicates, missing projects and orphaned costs surface in the sample load, when they are cheap to fix.

Do you use NetSuite CSV import or scripts?

Standard CSV import wherever it is sufficient, because it leaves an audit trail your team can read. SuiteScript or REST loads only where volumes or record types need them.

Tell us what you are moving from

Send the system, rough record counts and the target go-live month. We reply with a scoped plan and an outline price within two working days.

ResponseWithin one working day